News » Project Status » Baoneng Substation Put into Operation for Baosteel Zhanjiang Steel Base
Baoneng Substation Put into Operation for Baosteel Zhanjiang Steel Base
2015-03-12 02:46:14
Baoneng Substation Put into Operation for Baosteel Zhanjiang Steel Base
Baoneng Substation

Baoneng substation, main of plant-wide power supply and distribution project of Baosteel Zhanjiang Steel, was put into operation on November 30, 2014.

 As the only load-center substation of Zhanjiang Steel connecting Guangdong provincial grid, Baoneng substation is built with three 220kV elevated power lines connecting provincial grid, two 300MVA transformers, 110kV power line connecting self-contained power plant and steelworks’ users. Design and construction of Baoneng substation took about one year.

The good beginning of such 1st milestone of Zhanjiang Steel Base has set favorable foundation for on-grid generation of the self-contained power plant, safeguarding electrically. CISDI’s all-through efforts in design and site supervision were highly spoken by the client.

Home | About CISDI | News | Products | R&D | Career | Media | Contact Us
ADD: No.1 Shuanggang Road, Yuzhong District, Chongqing 400013, China.  Zip Code: 400013
Copyright by CISDI Group @ 2010